Cara Memperbaiki Step Motor Yang Bengkok

Bikin

FORM INSPEKSI Apendiks 1 –

Diagram Proses Inspection

Komplemen 2 –

Inspection Checklist

Pelengkap 3 –

HSE Inspection Log Register

4-

Inspeksi Pedestal Crane

5-

Inspeksi Mobil Crane

6-

Inspeksi Forklift

7-

Inspeksi Webb Sling

8-

Inspeksi Wire Rope Sling

9-

Inspeksi Chain Sling

10 –

Inspeksi Cutting Torch

11 –

Inspeksi Welding Machine

12 –

Inspeksi Compressed Gas

13 –

Inspeksi Gerinda

14 –

Inspeksi Vehicle

15 –

Inspeksi Boom Truck

16 –

Inspeksi Dump Truck

17 –

Inspeksi Bus

18 –

Inspeksi Fuel Truck

19 –

Inspeksi Vacuum Truck

20 –

Inspeksi Eye Wash Station

21 –

Inspeksi Trailer

22 –

Inspeksi Excavator

23 –

Inspeksi Bob Cat

24 –

Inspeksi Man Gondola

25 –

Inspeksi Generator

26 –

Inspeksi Air Compressor

27 –

Inspeksi Full Body Harness

28 –

Inspeksi SCBA

29 –

Inspeksi Portable Fire Extinguisher

30 –

Inspeksi Scaffolding

31 –

Inspeksi PPE

32 –

Inspeksi Portable Ladder

33 –

Inspeksi Personnel Bola keranjang

34 – Inspeksi Hooks

35 – Inspeksi Blocks Sheave 36 – Inspeksi Shackles 37 – Inspeksi Chain Block 38 –

Inspeksi Life Raft

39 –

Inspeksi Life Boat

40 –

Inspeksi Vessel Fire Prevention & Protection

41 –

Inspeksi Vessel Pedestal Grinder

42 –

Inspeksi Vessel Welding Machine & Transformer

43 –

Inspeksi Vessel Anchor Winch

44 –

Inspeksi Vessel Oxy/Acetylene Welding

45 –

Inspeksi Vessel Pressurized Cylinders

1. Diagram Proses Inspection

Operator

Supervisor dan/atau SC

PIC

HSE Coach

HSES Departemen

Menggudangkan & memonitor Log Register

Monitor tindak lanjut ketidaksesuaian

Kebutuhan Pemakaian Peralatan

Pemilahan Form Pre use checklist

Melakukan Pengecekan Peralatan

Tandatangan Pre use checklist

Pelaporan Pre use checklist

Menyetujui & Memeriksa

Menunjuk PIC tindak lanjut ketidaksesuaian

Verifikasi Hasil Perbaikan

Menindak lanjuti ketidaksesuaian

2. Inspection Checklist PRE USE INSPECTION CHECKLIST SUBJECT

:

INSPECTION NO :

LOCATION :

DATE

:

INSPECTOR :

SIGN

:

ITEM

DESCRIPTION

Recommendations/Action Items (Includes items immediately corrected) Item Recommendation / Action Item / PM Notification No:

Y

Assigned To:

Kaki langit

N/A

Completion Date:

Conducted by,

Acknowledge by,

Approved by,

(……………….)

(…………………)

(………………..)

3. HSE Inspection Batang kayu Register

4. Inspeksi Pedestal Crane SUBJECT

: PEDESTAL CRANE (OFFSHORE)

INSPECTION NO :

LOCATION :

DATE

:

INSPECTOR :

SIGN

:

ITEM

DESCRIPTION

1

Apakah seluruh pengendali intern kabin terdapat merek nan jelas?

2

Apakah instrument panel dilengkapi dengan penyinaran, termuat wilayah kerja?

3

Apakah load rating chart dan weight indicator terletak di dalam kabin dan kelihatan maka dari itu operator?

4

Apakah weight indicator system berkreasi dengan baik?

5

Apakah peralatan pemadam kebakaran mencukupi dan dirawat dengan baik?

6

Apakah sinyal-sinyal tangan terpajang di dalam crane?

7

Apakah belt, gears, shafts, pulleys, sprockets, drums dan flywheels diamankan dengan benar?

8

Apakah crane windows dan wipers privat kondisi yang baik?

9

Apakah kabin kondisi kudrati?

10

Apakah engine exhaust dilengkapi dengan spark arresters?

11

Apakah seluruh panjang dan handrails dalam kondisi yang baik?

12

Apakah seluruh perabot pengaman berlimpah di tempat dan berfungsi, termasuk sirene: Boom and Jibs Stop

a) Boom Hoist Disconnects b) Anti-two block device c) d)

Power Control Lowering (untuk mencegah penurunan yang tidak terkendali dalam kasus kegagalan crane)

13

Apakah crane dilengkapi dengan boom angel indicator?

14

Apakah wire rope intern kondisi baik, tersertifikat, dan terawat?

15

Apakah hook safety clip berfungsi dengan baik?

16

Apakah crane telah diInspeksi maka itu pihak yang tepat intern 3 tahun terakhir dan mempunyai tembusan?

17

Apakah crane dilengkapi dengan peralatan komunikasi antara awak kapal dan kapten kapal?

18

Apakah pelampung tersedia?

19

Apakah permukaan non slip dalam kondisi baik?

20

Apakah personnel baskets n domestik kondisi baik, digunakan dengan baik, dan diInspeksi ?

Y

N

N/A

21

Apakah crane drip pans terawat dengan baik?

22

Apakah pencahayaan mencukupi?

23

Apakah insinyur crane ditunjuk secara teragendakan?

24

Apakah crane terbebas berasal kebocoran hydraulic/fuel?

25

Apakah alat emergency shutdown tersuguh?

26

Apakah lampu peringatan beroperasi?

27

Periksa boom pin pada crane kerjakan keausan.

Recommendations/Action Items (Includes items immediately corrected) Item No:

Recommendation / Action Item / PM Notification

Assigned To:

Completion Date:

Conducted by,

Acknowledge by,

Approved by,

(……………….)

(…………………)

(………………..)

5 – Inspeksi Otomobil Crane SUBJECT

: MOBILE CRANE

INSPECTION NO :

LOCATION :

DATE

:

INSPECTOR :

SIGN

:

ITEM

DESCRIPTION

1

Visual Inspection of Hoist Rope / Periksa Secara Raga Sling Angkat

2

Visual Inspection of Boom Hoist Rope / Periksa Secara Fisik Sling Pengangkat Boom

3

Inspect Boom & Sheaves for Damage / Periksa Boom dan Sheaves pecah Kebinasaan

4

Inspect Hook Block & Safety Latch / Bahas Blok Pengait dan Akhir Keselamatan Blok

Y

Kaki langit

N/A

5

Inspect & Test All Limit Switches / Periksa dan Tes Semua Switch Senggat Minimal A. Bentrok Two Block Devices / pengaman Anti Two Block B. Boom Stopper

6

Weight Indicator Operational / Prinsip Kerja Indikator pelik Load Chart / Grafik Tanggung

7

Hoist Brake Operational / Cara Kerja Rem Pengangkatan

8

Boom Hoist Pawl Operational / Cara kerja Dudukkan Boom

9

Boom Hoist Override Operational / Prinsip Kerja Boom mendorong Pengangkatan.

10

Lurah Rotation Indicator / Penanda Adegan Drum

11

Check Around & Inspect If Any Bolt Lost / Cek dan Bahas Sekeliling Apakah ada Baut yang Hilang.

12

Boom Angle Indicator Operational / Mandu Kerja Parameter Tesmak Kemiringan

13

Inspect Hydraulic Hoses for Damage / Periksa Semua Selang Hidrolik dari Kerusakan

14

Gauges & Warning Light Operational / Cara Kerja instrumen ukur dan Lampu Peringatan A. Reverse Tanda bahaya / Alarm mundur B. Swinging Alarm / Alarm mengarun

15

Hydraulic Accumulator Pressure / Tekanan Hidroulik Accumulator.

16

V – Belts – Condition & Tension / Kondisi dan Ketegangan V-Belt

17

Pressure of Tires / Tekanan Kilangangin kincir Pita

18

Instrument Panel / Peralatan Panel

19

All Level Controls / Semua Alat Kontrol Kemiringan

20

Out Rigger Condition / Kondisi Peralatan tungkai asing

21

Clutch/Brake Fluid Level / Ketinggian Patra Rem dan Kopling

22

Fuel Level / Keagungan Target Bakar

23

Hydraulic Oil Level / Ketingian Minyak Hidrolik

24

Radiator Water Level / Keluhuran Air Radiator

25

Engine Oil Level / Ketinggian Oil Mesin

26

Battery Water Level / Ketinggian Air Aki

27

Safety Pin & Keepers/ Pin & Pengaman pin

28

Crane Certificate & Valid Mencicil / Sertifikat Crane masih main-main

Recommendations/Action Items (Includes items immediately corrected) Item No:

Recommendation / Action Item / PM Notification

Assigned To:

Completion Date:

Conducted by,

Acknowledge by,

Approved by,

(…………………)

(………………..)

6 – Inspeksi Forklift

(……………….)

SUBJECT

: FORKLIFT INSPECTION

INSPECTION NO :

LOCATION :

DATE

:

INSPECTOR :

TIME

:

ITEM

DESCRIPTION

1

Terdapat data keladak service? Ki akal pemeliharaan tersuguh di dalam sarana dan terbaru?

2

Asuransi sarana, registrasi, dokumentasi dan pajak tersedia di dalam wahana?

3

Supir dengan lisensi berkendara nan resmi dan ditunjuk oleh firma untuk menggunakan sarana?

4

Apakah kondisi masyarakat memuaskan? A

Selidik setagen pengaman: apakah berfungsi, 3 points fixing dan macam inersi?

B

Selidik kondisi ban, mencaplok reben cadangan

C

Periksa kondisi windshield dan wipers

D

Periksa kesediaan dan kondisi beling (spion kanan dan kiri)

E

Periksa seluruh bola lampu apakah berfungsi dengan baik (lampu busur depan, lampu busur belakang dan lampu rem dan bohlam indikator)?

F

Periksa awak mobil untuk kerusakan

G

Periksa jika seluruh instrumentasi pada control panel apakah berfungsi dengan baik (speed counter, dan lain-lain)

5

Apakah kebersihan memuaskan? Jikalau cak semau, apakah seluruh barang-barang dibawa dengan aman dan tidak menciptakan suatu bahaya untuk penumpang?

6

Periksa rem kaki: Apakah rem kaki efisien? Break pads dalam kondisi baik?

7

Periksa rem parkir: Apakah rem parkir efisien (alat angkut tidak harus berputar sekali-kali saat rem diaktifkan)?

8

Bahas fluids level plong mesin, brake reservoir, aki dan radiator, apakah pada tingkat yang memuaskan?

9

Periksa jika steering system beroperasi dengan moralistis?

10

Periksa jika klakson berfungsi?

11

APAR tersedia, mudah diakses dan dilengkapi terlepas Inspeksi nan valid?

12

Apakah ada peralatan darurat tersedia di kerumahtanggaan wahana (first aid kit)?

13

Apakah peralatan bakal memperbaiki dan penggantian ban tersaji intern kendaraan?

Y

Lengkung langit

N/A

Recommendations/Action Items (Includes items immediately corrected) Item No:

Recommendation / Action Item / PM Notification

Conducted by,

(……………………)

Assigned To:

Completion Date:

Acknowledge by,

Approved by,

(……………………….)

(…………………)

7 – Inspeksi Sling Synthetic SUBJECT: Sling Synthetic

INSPECTION No:

LOCATION:

DATE:

INSPECTOR:

TIME:

ITEM

DESCRIPTION

1

SWL atau WLL jelas terbaca

2

Bersih sebelum digunakan dan telah diInspeksi

Yes

No

Horizon/A

3

Tidak ada keausan berlebihan – tidak lebih dari 8%

4

Tidak ada perubahan bagan sebagaimana; benkok, terpelintir, terikat, meregang, terbelit, teriris dan retak

5

Lain ada korosi alias kerusakan akibat bulan-bulanan kimia

6

End fittings, terminal attachments alias sambungan tidak berubah/tembelang

7

Tak ada kerusakan fragmen kerumahtanggaan ataupun luar sling

8

Tidak ada babak sling yang terbakar akibat benda panas (perubahan warna)

9

Tidak ada liang pada webb sling

10

Lain cak semau abrasi lokal/Tergurat

11

Bukan ada kebinasaan akibat sinar mentari

12

Tidak suka-suka kerusakan jahitan

13

Safety catch berfungsi dengan baik

Recommendations/Action Items (Includes items immediately corrected) Item No:

Recommendation / Action Item / PM Notification

Conducted by,

(……………………)

8-

Assigned To:

Completion Date:

Acknowledge by,

Approved by,

(……………………….)

(…………………)

Inspeksi Wire Rope Sling

SUBJECT: Wire Rope Sling

INSPECTION No:

LOCATION:

DATE:

INSPECTOR:

TIME:

ITEM

DESCRIPTION

1

Apakah SWL atau WLL terbaca jelas dan n kepunyaan piagam yang masih berlaku

2

Apakah sling dalam peristiwa bersih

3

Apakah keausan tidak makin 8%

4

Kerusakan wire tak lebih dari satu

5

Bukan ada persilihan bentuk seperti mana; bengkok, terpelintir, terdorong, meregang, terbelit, abtar dan retak

6

Tidak ada korosi atau kehancuran akibat bahan kimia

7

End fittings, perhentian attachments atau sambungan enggak kemungkus

Yes

No

N/A

8

Tidak ada kebinasaan bagian dalam atau luar sling

9

Tidak terserah bagian sling yang terbakar akibat benda sensual

Recommendations/Action Items (Includes items immediately corrected) Item No:

Recommendation / Action Item / PM Notification

Conducted by,

(……………………)

Assigned To:

Completion Date:

Acknowledge by,

Approved by,

(……………………….)

(…………………)

9 – Inspeksi Chain Sling SUBJECT: Chains Sling

INSPECTION No:

LOCATION:

DATE:

INSPECTOR:

TIME:

ITEM

DESCRIPTION

Yes

1

SWL atau WLL terbaca jelas dan memiliki tembusan

2

Bersih sebelum digunakan dan diInspeksi

3

Tak ada keausan lebih pecah 8%

4

Enggak ada peralihan bentuk seperti mana; bengkok, terpelintir, terikat, meregang, terbelit, potol dan retak

5

Tidak ada korosi maupun kerusakan akibat sasaran ilmu pisah

6

End fittings, terminal attachments maupun sambungan bukan berubah/busuk

7

Fragmen sling bisa berputar bebas

No

Horizon/A

Recommendations/Action Items (Includes items immediately corrected) Item No:

Recommendation / Action Item / PM Notification

Assigned To:

Completion Date:

Conducted by,

(……………………)

Acknowledge by,

Approved by,

(……………………….)

(…………………)

10 – Inspeksi Cutting Torch SUBJECT

: Cutting Torch

INSPECTION NO :

LOCATION :

DATE

:

INSPECTOR :

SIGN

:

ITEM

DESCRIPTION

1

Oxygen Hose / Ular-ular Oksigen

2

Acetylene/LPG Hose / Ular-ular Asetilena / LPG

3

Mechanical Connection Clamp / Sambungan Jepit mekanis (……ea / bh)

4

Nozzle / Nozzle

5

Cutting torch Acetylene/LPG valve / Valve perangkat potong pada Asetilena/LPG

6

Cutting torch Oxygen valve / Valve instrumen pancung puas oksigen

7

Cutting torch Mixing Oxygen + Acetylene/LPG valve / Kran peranti tetak lega Paduan oksigen + Acitelin / LPG

8

Oxygen Regulator / Pengatur Oksigen

9

Acetylene/LPG Regulator / Pengatur Acetelin/LPG

10

Flash Back arrester after Oxygen bottle / Flash back arrestor setelah tabung oxygen

11

Flash Back arrester after Acetylene/LPG bottle / Flash back arrestor setelah torak asetilena/LPG

12

Flash Back Arrester Oxygen before cutting torch/Flash back arrestor sagur oxygen sebelum cutting torch

13

Flash Back arrester Acetylene/LPG before cutting torch / Flash back arrestor jalur asetilena/LPG sebelum cutting torch

14

Rack / Rak

15

Safety Chain / Kalung pengaman

Y

Tepi langit

Lengkung langit/A

16

Handle (back side) / Pegangan pada sisi belakang

17

Lighter (Triple lighter)

18

Key Cylinder (4 way keys) / Kunci torak

19

Oxygen bottles / Jambang Oksigen

20

Oxygen bottles valve / Kran bottol oksigen

21

Acetylene / LPG bottles / Jambang Asetilena/LPG

22

Acetylene / LPG bottles valve / Kran botol Asetilena / LPG

23

Oxygen bottles head protector / pelindung kran pot Oksigen

24

Acetylene / LPG bottles head protector / Pelindung kran jambang asetilena/LPG

Recommendations/Action Items (Includes items immediately corrected) Item No:

Conducted by,

(……………….)

Recommendation / Action Item / PM Notification

Assigned To:

Completion Date:

Acknowledge by,

Approved by,

(…………………)

(………………..)

11 -Inspeksi Welding Machine SUBJECT: WELDING MACHINE

INSPECTION No:

LOCATION:

DATE:

INSPECTOR:

TIME:

ITEM

DESCRIPTION

1

Power Supply – Apakah sumber energy ke mesin las sudah di lepaskan dan isolasi sebelum sensor.

2

Mains Supply Socket & Switch – Apakah tak suka-suka kerusakan dan cacat pada switch atau socket?

3

Mains Supply Socket & Switch – Apakah format plug sudah sesuai?

4

Plug & Primary Supply Cable to the Welding Machine – Apakah kapasitas benang tembaga power penting sudah sesuai dengan mesin las.?

5

Plug & Primary Supply Cable to the Welding Machine – Apakah kabel dalam kondisi aman dan terpasang dengan baik lega mesin las & plug?

6

Plug & Primary Supply Cable to the Welding Machine – Apakah tidak ada fasad puas plug atau benang tembaga (Terpotong, terbakar, tergores dan kerusakan ketertutupan kabel yang dapat membuat pekerja kesetrum)? . Ensure the supply cable is located away from welding cables and connections.

7

Plug & Primary Supply Cable to the Welding Machine – Apakah kabel las jauh dari kobel power utama & sambungan?

8

Welding Machine/Welding Power Source – Apakah body welding mesin, saklar-saklar listrik, lampu-lampu indicator & otoritas intern kondisi baik? Ensure any unused or exposed terminals have insulation in place. For outdoor use, ensure the welding machine has at least an IP23 rating.

9

Welding Machine/Welding Power Source –Apakah setiap setopan yang tak digunakan mempunyai isolasi alias dalam hal kesatuan hati?

10

Welding Machine –Apakah level oli dan fuel sesuai?

11

Welding Machine –Apakah pressure dan temperature sesuai?

12

Welding Machine –Apakah semua pengayak/saringan berfungsi dan kondisi baik?

13

Welding Machine –Apakah starting system berfungsi dengan baik (Batery & Connection, Selenoid & Valve)?

14

Welding Machine –Apakah v-belt tension dan pulley sesuai?

15

Welding Cable Connections – Apakah sambungan telegram las ke mesin las n domestik kondisi baik? Apakah parasan yang akan disambung asli dan sesuai?

16

Welding Cable Connections – Jika menunggangi setopan, apakah terminal yang tepat digunakan? Menunggangi brass washers (gangsa) dan terisolasi dengan sopan .

17

Welding Cables – Apakah dawai las (Leads) nonblok dari kebinasaan sebagai halnya; luka, tutung, insulasi rusak atau benang kuningan using atau kerusakan lainnya nan dapat mengakibatkan pekerja kesetrum. Panjang benang kuningan, gerendel dan rating sesuai.

18

Welding Cables – Apakah hierarki benang besi, buku dan rating sesuai?

19

Welding Cable Extension Connections – Apakah sambungan male dan female

Y

N

Tepi langit/A

sepenuhnya terisolasi dengan permukaan bersih dan tertanam dengan sopan? 20

Welding Hand Pieces – Apakah welding hand pieces tipe yang tepat, kondisi baik, sepenuhnya terisolasi dan rating yang tepat?

21

Work Return Clamp – Apakah work return clamp privat kondisi baik dan mempunyai sambungan nan aman?

22

Engine Drive Welding Machines – Apakah gas bermula exhaust lain tersebar di negeri kerja jikalau mesin las dioperasikan? (Jangan gunakan ruang tertutup ataupun berventilasi buruk)

23

Engine Drive Welding Machines – Apakah exhaust n domestik kondisi baik dan aman?

24

Apakah terserah grounding system?

25

Apakah dilengkapi GFCI?

Recommendations/Action Items (Includes items immediately corrected) Item No:

Recommendation / Action Item / PM Notification

Conducted by,

(……………………)

Assigned To:

Completion Date:

Acknowledge by,

Approved by,

(……………………….)

(…………………)

12 -Inspeksi Compressed Gas SUBJECT: COMPRESSED Asap CYLINDERS

INSPECTION NO:

LOCATION:

DATE:

INSPECTOR:

TIME:

ITEM

DESCRIPTION

1

Sudahkah dilakukan pembenaran kebocoran dan pemecahan silinder sesuai jenisnya?

2

Sudahkah diidentifikasi bahaya pencahanan/area sebelum memulai jalan hidup?

3

Apakah tabung memiliki tanggal pembenaran yang kredibel dalam kondisi serviceable, tidak tembelang?

Y

Falak

Ufuk/A

4

Apakah tabung oksigen dan acetylene ditutup ketika tidak n domestik pengusahaan aktif?

5

Apakah bumbung diamankan saat digunakan, botol diikat privat posisi agak kelam dengan material yang tidak mudah terbakar?

6

Apakah keranjang pengangkatan atau rak tabung digunakan untuk memindahkan tabung?

7

Apakah torak dengan jelas dilabel detik diterima dan digunakan?

8

Apakah tabung dilindungi dari seksi berlebih?

9

Pengunci/pelindung terpasang pada seluruh angkup-angkup momen silinder disimpan atau diangkut?

10

Apakah tabung menggunakan kode warna yang jelas berdasarkan isinya?

11

Apakah tabung nan hampa dipisahkan mulai sejak tabung yang penuh?

12

Apakah bumbung jauh dari bahan mudah terbakar?

13

Apakah silinder oksigen dan acetylene disimpan terpisah ketika tidak digunakan?

14

Apakah APD yang tepat digunakan oleh sida-sida yang menangani?

Recommendations/Action Items (Includes items immediately corrected) Item No:

Recommendation / Action Item / PM Notification

Conducted by,

(……………………)

Assigned To:

Completion Date:

Acknowledge by,

Approved by,

(……………………….)

(…………………)

13 -Inspeksi Gerinda SUBJECT: Gurinda

INSPECTION No:

LOCATION:

DATE:

INSPECTOR:

TIME:

ITEM

DESCRIPTION

1

Apakah kabel power sudah dilepas sebelum diperiksa?

2

Apakah kabel, plug dan sambungan dalam kondisi baik?

3

Apakah handle asli, tidak licin dan kondisi baik?

4

Apakah switch lever dan locking button berfungsi dengan bermartabat?

5

Apakah housing gurinda dalam kondisi baik dan tidak menghantar elektrik?

6

Apakah brush holder & brush cap kondisi baik?

7

Apakah name plate terbaca jelas (bukan mandatory)?

8

Apakah side handle dalam kondisi baik?

9

Apakah tool rest rata dan privat kondisi baik?

Yes

No

N/A

10

Apakah lock button berfungsi dengan baik?

11

Apakah gear cover terpajang dengan bermoral dan sesuai dimensi?

12

Apakah packing gland dalam kondisi baik?

13

Apakah wheel guard terpampang sesuai ukuran gerinda dan lain homemade?

14

Apakah grinding wheel sesuai RPM berasal mesin gerinda?

15

Adalah alat penaung diri khusus bagi penggunaan gerinda tersedia?

Recommendations/Action Items (Includes items immediately corrected) Item No:

Conducted by,

(……………………)

Recommendation / Action Item / PM Notification

Assigned To:

Completion Date:

Acknowledge by,

Approved by,

(……………………….)

(…………………)

Gambar Mesin Gerinda

14 – Inspeksi Vehicle (maupun mengacu TKO Operational Transportasi Darat) SUBJECT

: VEHICLE

INSPECTION NO :

LOCATION :

DATE

:

INSPECTOR :

TIME

:

ITEM

DESCRIPTION

Y

N

Kaki langit/A

1

Inspect around the vehicle and check for leaks of / Telaah keliling ki alat dan selidik kebocoran berasal : Water / Air Fuel / Bahan Bakar Kendaraan Oil / Oli Mesin Coolants / Air Pendingin

2

Check / Periksa : Tire Pressure / Tekanan Ban Tire Condition / Kondisi Reben Wheel Condition / Kondisi Pelek

3

Are the following in a clean condition? / Apakah yang berikut ini dalam kondisi bersih? Windows / Jendela Head Lights / Lampu Penting Indicators / Indikator Parking Lights / Bohlam Mengaret

4

Check the under hood of / Bahas Bagian Mesin Kendaraan : Oil Level / Mahamulia Oli Water Level / Ketinggian Air Radiator Washer Water Level / Keluhuran Air Pembersih Kaca Tension of Fan Belt / Keruncingan Tali Kipas Power Steering Level / Ketinggian Petro Stir

5

Check gauge properly / Periksa Alat Pengukuran : Fuel / Objek Bakar Oil Pressure / Impitan Oli Temperature / Suhu Voltmeter / Voltmeter

6

Check the operation of / Periksa Pengoperasiannya : Head Lights / Lampu Penting Indicators / Indicator Emergency Flash Lights / Senter Brake Light / Lampu Rem Backing Lights / Lampu Belakang Foot Brake / Rem Kaki Emergency Break / Rem Tangan Reverse Alarm / Tanda bahaya Mundur

7

Check thoroughly / Perkisa Secara Universal : Cab Lights / Lampu Cabin Air Conditioner / Alat Pendingin

Accelerator, Brake & Clutch / Percepatan, Rem & Kopling Adjustment Seat / Pengatur Kursi Horn / Klakson Mirrors / Kaca Spion 8

Other safety equipment with the vehicle / Peranti Keselamatan Wahana : Seat Belts / Sabuk Pengaman Emerg. Reflective Triangles / Segitiga sama Pengaman Fire Extinguisher / APAR Wheel Changing Equip. / Peralatan Silih Ban Drive Right Installed / Drive Right Terpasang

9

Check documentation / Periksa Kelengkapan Dokumen Registration / Registrasi Proof of Ownership / Persetujuan terbit Empunya Proof of Insurance / Permufakatan terbit Asuransi Road Map / Denah Pengelanaan

10

Other Critical Equipment / Peralatan penting lainnya Chain for Securing Equipment / Rantai Pengikatan Load Binder / Pengunci Dagangan Nipple Pipe / Pipe Penyambung Lock container / Trik container Bumper/Hook / Bamper/Pengait

Recommendations/Action Items (Includes items immediately corrected) Item No:

Recommendation / Action Item / PM Notification

Assigned To:

Completion Date:

Conducted by,

Acknowledge by,

Approved by,

(……………………)

(……………………….)

(…………………)

15 -Inspeksi Boom Truck

SUBJECT

: BOOM TRUCK

INSPECTION NO :

LOCATION :

DATE

:

INSPECTOR :

SIGN

:

ITEM

DESCRIPTION

1

Sistem Pendingin Mesin ( Air Radiator )

2

Oli Mesin

3

Oli Hidrolik

4

Filter Udara

5

Kondisi Ban

6

Tekanan Udara Lin

7

Baut Besikal

8

Air Batere

9

Klep Tabung Kompresor

10

Air Tabung Kompresor ( Campakkan )

11

Minyak Rem

12

Minyak Power Steering

13

Kaca ( Depan, Samping, Belakang )

14

Kaca Spion

15

Fungsi Kendit Keselamatan

16

Kondisi Mesin

17

Fungsi Panel Instrumen

18

Fungsi Klakson & Backup Peluit

19

Guna Pengereman

20

Fungsi Kopling, Stelan Pedal Kopling

21

Fungsi Rem Parkir

22

Lampu Indikator Belakang ( Belok, Seri, Mundur dll )

23

Lampu Indikator Depan ( Kungkung, Kilap, dll )

24

Lampu busur Rem

25

Lampu Rotary & Emergency Lainnya

26

Bola lampu Utama Depan

27

Instrumen Keselamatan Kerja

28

Bumbung Pemadam Kebakaran

29

Segitiga Pengaman dan P3K

30

Grease ( Pelumasan ) BOOM HYDRAULIC SYSTEM

1

PTO ( Power Take Off )

2

Hydraulic Oil Tank

Y

Falak

N/A

3

Hydraulic Pump

4

Control Valve

5

Boom

6

Hydraulic Motor

7

Outrigger

Recommendations/Action Items (Includes items immediately corrected) Item No:

Conducted by,

(……………………)

Recommendation / Action Item / PM Notification

Assigned To:

Completion Date:

Acknowledge by,

Approved by,

(……………………….)

(…………………)

16 -Inspeksi Dump Truck SUBJECT :

LOCATION:

LOCATION :

DATE:

INSPECTOR :

TIME:

ITEM

DESCRIPTION

1

Sistem Penyaman Mesin ( Air Radiator )

2

Oli Mesin

3

Oli Hidrolik

4

Filter Udara

5

Kondisi Ban

6

Tekanan Udara Ban

7

Baut Roda

8

Air Batere

9

Klep Tabung Kompresor

10

Air Tabung Kompresor ( Buang )

11

Minyak Rem

12

Minyak Power Steering

13

Kaca ( Depan, Samping, Pinggul )

14

Beling Spion

15

Guna Bengkung Keselamatan

16

Kondisi Mesin

17

Guna Panel Gawai

18

Fungsi Klakson & Backup Alarm

19

Fungsi Pengereman

20

Fungsi Kopling, Stelan Pedal Kopling

21

Fungsi Rem Parkir

22

Lampu Indikator Pantat ( Belok, Seri, Mundur dll )

23

Lampu Parameter Depan ( Kungkung, Seri, dll )

24

Lampu Rem

25

Lampu Rotary & Emergency Lainnya

26

Lampu Utama Depan

27

Perlengkapan Keselamatan Kerja

28

Silinder Pemadam Kebakaran

29

Segitiga Pengaman dan P3K

30

Grease ( Pelumasan ) BOOM HYDRAULIC SYSTEM

1

PTO ( Power Take Off )

Y

N

N/A

2

Hydraulic Oil Tank

3

Hydraulic Pump

4

Control Valve

5

Dump Cylinder

6

Hydraulic Motor

7

Seal Dump ( Ram Door )

17 -Inspeksi Bus

Recommendations/Action Items (Includes items immediately corrected) Item No:

Conducted by,

(……………………)

Recommendation / Action Item / PM Notification

Assigned To:

Completion Date:

Acknowledge by,

Approved by,

(……………………….)

(…………………)

SUBJECT

: BUS

INSPECTION NO :

LOCATION :

DATE

:

INSPECTOR :

SIGN

:

ITEM

DESCRIPTION

1

Kebersihan Kendaraan

2

Sistem Pendingin Mesin ( Air Radiator )

3

Oli Mesin

4

Penyaring Awan

5

Kondisi Pita

6

Tekanan Udara Ban

7

Baut Roda

8

Battere

9

Minyak Rem

10

Minyak Power Steering

11

Kaca ( Depan, Samping, Pinggul )

12

Beling Spion

13

Fungsi Kendit Keselamatan

14

Kondisi Mesin

15

Fungsi Panel Radas

16

Fungsi Klakson & Backup Alarm

17

Fungsi Pengereman

18

Fungsi Kopling, Stelan Pedal Kopling

19

Fungsi Rem Parkir

20

Bola lampu Indikator Bokong ( Belok, Sinar, Ki bertambah dll )

21

Lampu Indikator Depan ( Belok, Binar, dll )

22

Lampu busur Rem

23

Lampu Utama Depan

24

Organ Keselamatan Kerja

25

Tabung Pemadam Kebakaran

26

Segitiga Pengaman dan P3K

27

Grease ( Pelumasan )

28

Wheel Chock (Lapik Sepeda)

29

Kursi Penumpang

Y

N

N/A

Recommendations/Action Items (Includes items immediately corrected) Item No:

Recommendation / Action Item / PM Notification

Assigned To:

Completion Date:

Conducted by,

Acknowledge by,

(……………………)

(……………………….)

Approved by,

(…………………)

18 -Inspeksi Fuel Truck SUBJECT

: FUEL TRUCK

INSPECTION NO :

LOCATION :

DATE

:

INSPECTOR :

SIGN

:

ITEM

DESCRIPTION

1

Sistem Pengadem Mesin ( Air Radiator )

2

Oli Mesin

3

Oli Hidrolik

4

Filter Mega

5

Kondisi Lin

6

Tekanan Udara Ban

7

Baut Roda

8

Air Batere

9

Klep Bumbung Kompresor

10

Air Tabung Kompresor ( Buang )

11

Minyak Rem

12

Minyak Power Steering

13

Kaca ( Depan, Samping, Belakang )

14

Kaca Spion

15

Keefektifan Setagi Keselamatan

16

Kondisi Mesin

17

Fungsi Panel Instrumen

18

Fungsi Klakson & Backup Alarm

19

Fungsi Pengereman

20

Kepentingan Kopling, Stelan Pedal Kopling

21

Fungsi Rem Parkir

22

Lampu Indikator Pinggul ( Belok, Seri, Mundur dll )

23

Lampu Indikator Depan ( Belok, Cuaca, dll )

24

Lampu Rem

25

Lampu Rotary & Emergency Lainnya

26

Lampu busur Utama Depan

27

Perlengkapan Keselamatan Kerja

28

Tabung Pemadam Kebakaran

29

Segitiga Pengaman dan P3K

30

Grease ( Pelumasan ) BOOM HYDRAULIC SYSTEM

1

PTO ( Power Take Off )

Y

Tepi langit

Tepi langit/A

2

Hydraulic Oil Tank

3

Hydraulic Pump

4

Control Valve

5

Dump Cylinder

6

Hydraulic Pengambil inisiatif

7

Seal Dump ( Ram Door )

Recommendations/Action Items (Includes items immediately corrected) Item No:

Conducted by,

(……………………)

Recommendation / Action Item / PM Notification

Assigned To:

Completion Date:

Acknowledge by,

Approved by,

(……………………….)

(…………………)

19 -Inspeksi Vacuum Truck SUBJECT

: VACUUM TRUCK

INSPECTION NO :

LOCATION :

DATE

:

INSPECTOR :

TIME

:

ITEM

DESCRIPTION

1

Sistem Pendingin Mesin ( Air Radiator )

2

Oli Mesin

3

Oli Hidrolik

4

Filter Udara

5

Kondisi Ban

6

Tekanan Udara Ban

7

Baut Sepeda

8

Air Batere

9

Klep Torak Kompresor

10

Air Silinder Kompresor ( Lempar )

11

Minyak Rem

12

Petro Power Steering

13

Kaca ( Depan, Samping, Belakang )

14

Kaca Spion

15

Kemustajaban Sabuk Keselamatan

16

Kondisi Mesin

17

Fungsi Panel Instrumen

18

Kekuatan Klakson & Backup Alarm

19

Guna Pengereman

20

Kebaikan Kopling, Stelan Pedal Kopling

21

Fungsi Rem Parkir

22

Lampu Indikator Belakang ( Belok, Seri, Memulur dll )

23

Bohlam Indikator Depan ( Belok, Seri, dll )

24

Lampu Rem

25

Lampu busur Rotary & Emergency Lainnya

26

Lampu Utama Depan

27

Instrumen Keselamatan Kerja

28

Tabung Pemadam Kebakaran

29

Segitiga sama kaki Pengaman dan P3K

30

Grease ( Pelumasan ) VACUUM HYDRAULIC / PNEUMATIC SYSTEM

1

PTO ( Power Take Off )

Y

Cakrawala

Horizon/A

2

Hydraulic Vacuum Oil

3

Hydraulic Pump

4

Pneumatic & Hydraulic Control Valve

5

Vacuum Tank Leakage and Pressure Gauge

6

Suction Valve ( In & Out )

7

Suction Hose & Accessories

Recommendations/Action Items (Includes items immediately corrected) Item No:

Recommendation / Action Item / PM Notification

Conducted by,

(……………………)

Assigned To:

Completion Date:

Acknowledge by,

Approved by,

(……………………….)

(…………………)

20 –Checklist Eye Wash Station (Dilakukan Weekly atau Monthly) SUBJECT

: Eye Wash Station

INSPECTION NO :

LOCATION :

DATE

:

INSPECTOR :

SIGN

:

ITEM

DESCRIPTION

1

Apakah akses tak terhalang?

2

Apakah area sekitar tidak licin?

3

Apakah terdapat tag Inspeksi ?

4

Apakah ditempatkan dengan posisi yang sesuai?

5

Apakah level air cukup?

6

Apakah ada peredaran air?

7

Apakah lain ada kebocoran?

Y

Ufuk

Ufuk/A

8

Apakah berfungsi momen dites?

9

Apakah unit dalam keadaan tahir?

10

Apakah terdapat data kadaluarsa (eye wash botol)?

21 -Inspeksi Trailer

Recommendations/Action Items (Includes items immediately corrected) Item No:

Recommendation / Action Item / PM Notification

Assigned To:

Completion Date:

Conducted by,

Acknowledge by,

Approved by,

(……………….)

(…………………)

(………………..)

SUBJECT

: TRAILER

INSPECTION NO :

LOCATION :

DATE

:

INSPECTOR :

TIME

:

ITEM

DESCRIPTION

1

Sistem Pendingin Mesin ( Air Radiator )

2

Oli Mesin

3

Filter Udara

4

Kondisi Reben

5

Tekanan Udara Tali tap

6

Baut Roda

7

Air Batere

8

Angkup-angkup Silinder Kompresor

9

Air Tabung Kompresor ( Buang )

10

Minyak Rem

11

Petro Power Steering

12

Kaca ( Depan, Samping, Bokong )

13

Beling Spion

14

Fungsi Setagen Keselamatan

15

Kondisi Mesin

16

Fungsi Panel Instrumen

17

Kekuatan Klakson & Backup Alarm

18

Fungsi Pengereman

19

Kelebihan Kopling, Stelan Pedal Kopling

20

Fungsi Rem Parkir

21

Lampu Penunjuk Birit ( Belok, Seri, Memulur dll )

22

Lampu busur Indikator Depan ( Belok, Cahaya, dll )

23

Lampu Rem

24

Bohlam Rotary & Emergency Lainnya

25

Lampu Utama Depan

26

Peranti Keselamatan Kerja

27

Tabung Pemadam Kebakaran

28

Segitiga Pengaman dan P3K

29

King Pin

30

Grease ( Pelumasan ) HIGH BED / LOW BED

1

Hose Angin dan Sambungan

2

U-Bolt dan Center Bolt

Y

N

N/A

3

Velg dan Bolt Pit

4

Lampu Lampu ( Belok, Seri, Memulur dll )

5

Back Up Alarm

6

Piringan / Turn Table

7

Chamber Brake

Conducted by,

Acknowledge by,

Approved by,

Recommendations/Action Items (Includes items immediately corrected) Item No:

Recommendation / Action Item / PM Notification

(……………………)

22 -Inspeksi Excavator

(……………………….)

Assigned To:

Completion Date:

(…………………)

SUBJECT

: EXCAVATOR DAILY INSPECTION CHECKLIST

INSPECTION NO :

LOCATION :

DATE

:

INSPECTOR :

TIME

:

ITEM

DESCRIPTION

1

Sistem Penyaman Mesin ( Air Radiator )

2

Oli Mesin

3

Filter Udara

4

Fuel Level

5

Kondisi Ban

6

Tekanan Udara Pita

7

Baut Roda

8

Air Batere

9

Hydraulic Oil

10

Boom Cylinder

11

Lift Cylinder

12

Tilt Cylinder

13

Beling ( Depan, Samping, Pantat )

14

Kaca Spion

15

Kebaikan Kendit Keselamatan

16

Kondisi Mesin

17

Kebaikan Panel Instrumen

18

Fungsi Klakson & Backup Alarm

19

Fungsi Pengereman

20

Faedah Rem Parkir

21

Lampu Indikator Belakang ( Belok, Kurat, Mundur dll )

22

Lampu Penanda Depan ( Belok, Cerah, dll )

23

Lampu Rem

24

Lampu busur Rotary & Emergency Lainnya

25

Lampu Utama Depan

26

Perabot Keselamatan Kerja

27

Tabung Pemadam Kebakaran

28

Segitiga sama Pengaman dan P3K

29

Articulated King Pin

30

Grease ( Pelumasan )

Y

Horizon

N/A

Recommendations/Action Items (Includes items immediately corrected) Item

Recommendation / Action Item / PM Notification

Assigned

Completion

No:

To:

Date:

23 -Inspeksi Bob Cat

Conducted by,

(……………………)

Acknowledge by,

Approved by,

(……………………….)

(…………………)

SUBJECT

: BOBCAT DAILY INSPECTION CHECKLIST

INSPECTION NO :

LOCATION :

DATE:

INSPECTOR :

TIME:

ITEM

DESCRIPTION

1

Sistem Penyaman Mesin ( Air Radiator )

2

Oli Mesin

3

Penyaring Gegana

4

Fuel Level

5

Kondisi Ban

6

Tekanan Peledak Ban

7

Baut Roda

8

Air Batere

9

Hydraulic Oil

10

Boom Cylinder

11

Gondola Cylinder

12

Kaca ( Depan, Samping, Birit )

13

Fungsi Angkin Keselamatan

14

Kondisi Mesin

15

Guna Panel Perangkat

16

Fungsi Klakson & Backup Alarm

17

Kurnia Pengereman

18

Lampu Indikator Pantat ( Belok, Seri, Memulur dll )

19

Bohlam Parameter Depan ( Pasung, Seri, dll )

20

Bohlam Rem

21

Lampu Rotary & Emergency Lainnya

22

Lampu Terdepan Depan

23

Alat Keselamatan Kerja

24

Tabung Pemadam Kebakaran

25

Segitiga sama kaki Pengaman dan P3K

26

Kondisi Bucket

27

Grease ( Pelumasan )

Y

N

N/A

Recommendations/Action Items (Includes items immediately corrected) Item No:

Recommendation / Action Item / PM Notification

Assigned To:

Completion Date:

Conducted by,

Acknowledge by,

Approved by,

(……………………….)

(………………….)

24 -Inspeksi Man Lift

(……………………)

SUBJECT

: MAN Lift DAILY INSPECTION CHECKLIST

INSPECTION NO :

LOCATION :

DATE

:

INSPECTOR :

TIME

:

ITEM

DESCRIPTION

1

Sistem Penyejuk Mesin ( Air Radiator )

2

Oli Mesin

3

Filter Peledak

4

Fuel level and separator

5

Kondisi Tali tap

6

Impitan Reben

7

Baut Pit

8

Kondisi Battery

9

Oli Hydraulic

10

Boom Cylinder

11

Lift Cylinder

12

Kondisi Mesin

13

Fungsi Panel Peranti

14

Lampu Rotary & Emergency lainya

15

Kondisi Bucket

16

Kondisi Body harness

17

Sistem Pendingin Mesin ( Air Radiator )

18

Oli Mesin

Y

N

N/A

Recommendations/Action Items (Includes items immediately corrected) Item No:

Conducted by,

Recommendation / Action Item / PM Notification

Acknowledge by,

Assigned To:

Completion Date:

Approved by,

(……………………)

(……………………….)

(…………………)

25 -Checklist Generator (Dilakukan weekly atau monthly) SUBJECT: Emergency Generator

INSPECTION No:

LOCATION:

DATE:

INSPECTOR:

TIME:

ITEM 1

DESCRIPTION COOLING SYSTEM Oil Level Water Radiator Level

2

PRESSURE Diesel fuel Engine Oil

3

TEMPERATURE Engine Oil

Yes

No

N/A

Water Cooling System Exhaust 4

FILTERS Oil Penapis Fuel Filter Air Filter

5

STARTING SYSTEM Pressure Air Lubricator Selenoid/Valve

6

V-BELT TENSION & PULLEY

7

SPEED

8

BATTERIES

9

BATTERIES CHARGER SYSTEM

10

STATOR/ROTOR WINDING RESISTANCE

11

PANEL CONTROL GENSET/AVR

12

COOLING SYSTEM

Recommendations/Action Items (Includes items immediately corrected) Item No:

Conducted by,

(……………………)

Recommendation / Action Item / PM Notification

Assigned To:

Completion Date:

Acknowledge by,

Approved by,

(……………………….)

(…………………)

26 -Inspeksi Air Compressor SUBJECT

: Air Compressor

INSPECTION NO :

LOCATION :

DATE

:

INSPECTOR :

SIGN

:

ITEM

DESCRIPTION

1

Air Compressor & Lingkungan selingkung aman

2

ENGINE OIL LEVEL

3

FUEL LEVEL

4

BATTERIES

5

V-BELT TENSION & PULLEY PRESSURE

6

Diesel fuel

7

Engine Oil TEMPERATURE

8

Engine Oil

9

Cooling System

10

Exhaust FILTERS

11

Oil Tapis

12

Fuel Tapis

13

Air Intake Tapis

14

Air Compressor Filter

15

Batteries Charging System

Y

Tepi langit

Falak/A

Air Pressure 16

Load Pressure (Psig)

17

Unload Pressure (Psig)

18

Sambungan ujar-ujar terpampang dengan benar & terpasang pengaman agar tidak magfirah

19

Body dari air compressor dalam keadaan baik

20

Roda dalam kejadian baik dan berfungsi

21

Pengaman benda berputar terpajang

22

Titik pengangkatan telah diInspeksi

23

Perlengkapan pelindung diri spesifik tersedia momen akan mengoperasikan Air Compressor

Recommendations/Action Items (Includes items immediately corrected) Item No:

Recommendation / Action Item / PM Notification

Assigned To:

Completion Date:

Conducted by,

Acknowledge by,

Approved by,

(……………….)

(…………………)

(………………..)

27 -Inspeksi Full Body Harness SUBJECT: Full Body Harness

INSPECTION No:

LOCATION:

DATE:

INSPECTOR:

TIME:

ITEM

DESCRIPTION

1

Apakah peralatan dalam situasi bersih?

2

Webbing objektif dari (selidik kedua sisi dari strap) A

Pinggiran strap berjumbai & kerusakan serat

B

Jengkal membengang

C

Kotok

D

Terbakar & Kemungkus akibat bahan kimia D-Rings bebas dari

3 A

Retak

B

Tepian bernafsu ataupun tajam

C

Bengkok

D

Berdekil & tidak begerak bebas Attachment of Buckles objektif berusul

4 A

Kehancuran jahitan buckles

B

Serat sobek ataupun terpenggal

C

Tersambung dengan baik Tongue Buckles adil berpokok

5 A

Kerusakan

B

Sisi yang tajam

C

Mudah disambung

D

Kehancuran grommets/gua pada strap Mating Buckles bebas dari

6 A

Kerusakan

B

Bar luar dan tengah tak verbatim

C

Sisi buckle tajam Hardware / Hook

7 A

Hook tidak rusak, bengkok atau retak & bebas berpokok karat

B

Latch & keeper berfungsi dengan baik Lanyard & Shock (Web & Rope) adil berusul

8 A

Terpotong, putus, pembengkakan, perubahan warna, retak

B

Tutung atau kebinasaan akibat bahan kimia dan sensual berlebihan

C

Kerusakan jahitan

Y

N

N/A

D

Kerusakan thimbles/mata ujung yang disambung pada hook

E

Kerusakan shock absorber

F

Peralihan kaliber rope Self-Retracting Lanyard bebas dari

9 A

Kerusakan housing

B

Tidak berfungsi braking mechanism

C

Kerusakan Lifeline

D

Kerusakan alat bantu lain seperti karabiner, hook dll

E

Ukuran nan tak sesuai

Recommendations/Action Items (Includes items immediately corrected) Item No:

Recommendation / Action Item / PM Notification

Conducted by,

(……………………)

Assigned To:

Completion Date:

Acknowledge by,

Approved by,

(……………………….)

(…………………)

28 -Checklist SCBA (Dilakukan weekly atau monthly) SUBJECT: SELF CONTAINED BREATHING APPARATUS

INSPECTION No:

LOCATION:

DATE:

INSPECTOR:

TIME:

ITEM

DESCRIPTION

1

Apakah seluruh bagian reja, diaphragm dan katup cek bebas dari tusukan, kebinasaan dan tanda-tanda dipakai?

2

Apakah penggalan-episode ferum adil terbit gerinda, retak, goresan, penyok dan korosi?

3

Apakah selang objektif semenjak tusukan, torehan dan pengikisan berlebihan?

4

Apakah Knobs objektif dari retak dan melekat dengan kencang puas batang katup?

Y

Lengkung langit

Cakrawala/A

5

Apakah suka-suka tera-jenama hilang alias rusak hardware, seperti nuts, screws dan Washers?

6

Apakah gauges bebas dari kebinasaan atau lensa kaca berpangkal?

7

Regulator tekanan mega tekanan gauges utuh dan berfungsi seluruh injap berfungsi dan dalam kondisi baik?

8

Bypass ventilasi katup dalam rangka kerja tidak cak semau mega nan harus bocor ketika stok gegana puas “demand” tren tekanan udara positif pada masker wajah?

9

Apakah suka-suka rivet yang hilang atau lain normalnya buckles lega webbing?

10

Apakah ada tanda kerusakan atau renggan yang berlebih sreg kedok paras, robekan atau hilang mask buckles?

11

Apakah terserah perlambang tidak baku pada head harness dan straps?

12

Apakah SOP SCBA ditempat dan dipajang?

13

Apakah ada logo-etiket korosi ataupun bukan normal pada torak udara?

14

Apakah cak semau perlambang fasad plong kontainer penyimpanan atau mobile carrying case?

15

Apakah ada dok bagi hingga ke akses SCBA?

16

Apakah stempel arah mendekati lokasi stasiun SCBA utuh?

17

Apakah Back pack dan harness komplet Complete set of shoulder, side and waist straps (bebas berpangkal kerusakan)?

18

Apakah buckle privat operasi Cylinder hold-down strap/buckle n domestik kondisi baik dan dikencangkan dengan awet?

19

Apakah silinder, perakitan katup dan silinder ujar-ujar terpajang dengan baik di harness? Apakah tes hydrostatic cak bagi torak, nonblok semenjak penyok ataupun retak?

20 21

Apakah tekanan di torak hijau/terisi penuh, zona aliran udara/nozzle lubang objektif dari gudi dan perpautan bebas dari kebocoran mega?

22

Apakah pendataan konfirmasi rutin kerjakan isi silinder tersuguh?

Recommendations/Action Items (Includes items immediately corrected) Item No:

Conducted by,

Recommendation / Action Item / PM Notification

Acknowledge by,

Assigned To:

Completion Date:

Approved by,

(……………………)

(……………………….)

(…………………)

29 -Checklist Portable Fire Extinguisher (Dilakukan weekly/monthly) SUBJECT: Portable Fire Extinguisher

INSPECTION No:

LOCATION:

DATE:

INSPECTOR:

TIME:

ITEM

DESCRIPTION

1

Apakah APAR nan sesuai ki berjebah dilokasi kerja?

2

Dipasang pada jarak yang lega dada dan mudah dijangkau?

3

Tempat APAR bebas dari dok alias bahaya lainya?

4

Takdirnya digantung maupun dimasukan dalam box, tempat gantungan atau box dalam keadaan kesepakatan dan tidak mudah jatuh?

5

Apakah terserah tag Inspeksi rutin & tahunan?

6

Apakah ada tanda yang menunjukan jenis APAR?

7

Apakah safety pin masih terpasang?

8

Apakah handle tidak kemungkus?

9

Apakah nozzle n domestik hal kudrati dan tidak mencuru atau patah?

10

Apakah nozzle yang dipasang sesuai dengan isi tabung?

11

Apakah pressure gauge berfungsi dan menunjukan isi yang sesuai?

12

Apakah kondisi bumbung enggak korosif, penyok atau kembung?

13

Apakah Leher tabung privat situasi bersih dan tidak berkarat?

14

Apakah wheel/Roda berfungsi dengan baik?

15

Apakah ajaran pengusahaan APAR tersedia?

Recommendations/Action Items (Includes items immediately corrected)

Yes

No

Falak/A

Item No:

Recommendation / Action Item / PM Notification

Conducted by,

(……………………)

Assigned To:

Completion Date:

Acknowledge by,

Approved by,

(……………………….)

(…………………)

30 -Inspeksi Scaffolding SUBJECT: Scaffolding

INSPECTION No:

LOCATION:

DATE:

INSPECTOR:

TIME:

ITEM

DESCRIPTION

1

Apakah karyawan mengetahui persyaratan-persyaratan scaffolding?

2

Apakah personel mengetahui sistem scaff-tag?

3

Apakah sistem Scafftag digunakan?

4

Apakah seluruh Scafftag nan suka-suka dan digunakan ditanda tangani oleh penandatangan yang berwenang?

5

Apakah Kickboards dipasang dan diamankan?

6

Apakah tangga diamanakan dan diperpanjang 1 meter melebihi tingkat terakhir masuk?

7

Apakah handrails bersifat loyal pada mahamulia paling berpangkal 1100 mm?

8

Apakah ada segel-tera kebinasaan atau aleration pada struktur?

9

Apakah ada register scaffold yang terkini?

10

Apakah seluruh tingkat konsisten rapih dari metarial longgar/sampah?

11

Apakah tangga 6 meter atau lebih ditopang di bagian tengahnya?

12

Apakah mobile scaffold bukan lebih panjang dari 3 meter?

13

Apakah seluruh plank diamankan dan diperpanjang minimum 15 cm dengan lain melebihi 20 cm celah?

14

Apakah area pemasangan scaffolding yang belum selesai dibarikade?

15

Apakah personil scaffolding tersertifikasi?

Y

Kaki langit

N/A

Recommendations/Action Items (Includes items immediately corrected) Item No:

Recommendation / Action Item / PM Notification

Conducted by,

(……………………)

Assigned To:

Completion Date:

Acknowledge by,

Approved by,

(……………………….)

(…………………)

31 -Checklist PPE (Weekly/monthly alias mengajuk TKO APD) SUBJECT: Personnel Protective Equipment (PPE)

INSPECTION No:

LOCATION:

DATE:

INSPECTOR:

ITEM

TIME:

DESCRIPTION

Yes

1

Apakah karyawan mengetahui bagaimana untuk menentukan tipe APD majemuk tipe pekerjaan?

2

Apakah fungsionaris mengobservasi persyaratan intern prosedur?

3

Apakah karyawan mengarifi bagaimana untuk memilih respirator & cartridge yang tepat?

4

Apakah karyawan memiliki akses lakukan peralatan keselamatan spesifik (contoh. Pelindung Jatuh)?

5

Apakah karyawan mengetahui bagaimana lakukan mendapatkan sarung tanga tepat untuk pekerjaan kimia?

6

Apakah tenaga kerja mengetahui lokasi programa termuat respiratory protection?

7

Sudahkah pegawai mengidentifikasi bahaya dari pegangan/area sebelum memulai pencahanan?

8

Apakah APD yang digunakan oleh karyawan dalam kondisi baik?

9

Apakah karyawan/pemborong memakai employees/contractors wearing proper PPE?

10

Apakah APD dirawat dengan tepat?

11

Apakah hardhat cacat, dicat alias terkena bahan kimia?

12

Apakah hardhat dalam kondisi baik dan bebas terbit segala kehancuran yang terlihat atau modifikasi?

13

Apakah kacamata keselamatan dilengkapi dengan pelindung sisi?

14

Apakah cutting goggles dipakai saat memotong dengan oxy acetylene?

15

Apakah full-face eye shield dipakai untuk grinding?

16

Apakah sarung tangan yang tepat digunakan buat jalan hidup distingtif? (lengkap. Pengelasan, Peledakan)

17

Apakah penaung pendengaran digunakan saat bekerja di lokasi lebih dari 85 dB?

18

Pada saat earplug buncit mungkin dibersihkan (reusable ear plug)?

19

Are employees wearing the appropriate footwear? (check the condition)

20

Apakah masker abuk yang tepat dipakai di kewedanan berdebu?

21

Apakah air supplied respiratory hoods dipakai lakukan peledakan alias pewarnaan?

22

Apakah safety harness dipakai dan diamankan ketika bekerja dengan jalal lebih dari 2 meter?

23

Apakah safety harness internal kondisi baik dan adil berpokok minyak dan oli?

24

Apakah pakaian pelindung nan tepat dipakai sepanjang hari oleh karyawan?

25

Apakah daerah Dekarmasi untuk penggunaan APD ditandai dengan jelas?

26

Apakah tipe respiratori nan sopan digunakan?

27

Apakah setiap prosedur ditampilkan mengenai bagaimana menggunakan respirator?

28

Pelindung laser eye khusus buat memiara inferior 3B dan peralatan laser atas?

29

Apakah instruksi mengoperasikan dan surat tempelan menggunakan APD mencukupi?

APD

yang

tepat?

Are

No

N/A

30

Apakah ada fasilitas penyimpanan dan pembersihan untuk APD?

Recommendations/Action Items (Includes items immediately corrected) Item No:

Recommendation / Action Item / PM Notification

Conducted by,

(……………………)

Assigned To:

Completion Date:

Acknowledge by,

Approved by,

(……………………….)

(…………………)

32 -Inspeksi Portable Ladder SUBJECT: Portable Ladder

INSPECTION No:

LOCATION:

DATE:

INSPECTOR:

TIME:

ITEM

DESCRIPTION

GENERAL 1

Side rails privat kondisi baik

2

Steps atau rungs tidak rusak atau bengkok

3

Spreader braces tidak kemungkus ataupun mendelongop

4

Tidak ada baut atau intiha yang lepas ataupun busuk

5

Tangga bebas semenjak oli, minyak lincir dan bulan-bulanan yang menyebabkan licin

Y

Tepi langit

N/A

6

Kapasitas, dimensi dan manufacture terpasang

7

Dapat dipindahkan dengan mudah

8

Tidak ada bagian yang pipih, bengkok, retak atau patah

9

Bertentangan slip pada ujung tahapan tidak rusak

10

Format sesuai detik akan digunakan

11

Disimpan dengan benar menghindari kerusakan

12

Tangga terpaut alias diamankan saat dipasang

13

Ajang pemasangan tangga rata

14

Tangga tidak mudah goyang dan jatuh/turun STEP LADDERS

15

Anak asuh tangga lain goyang maupun longgar

16

Anti slip anak tangga enggak rusak

17

Anak tangga lain miring

18

Ukuran jarak anak asuh tataran sama EXTENSION LADDERS

19

Extension locks tidak longgar, rusak atau lepas

20

Lock terpasang dengan benar saat tinggi diperpanjang

21

Pulley, tali dan pengunci dalam kondisi baik

22

Jarak anak asuh hierarki tak melebihi 30’ tingginya

Recommendations/Action Items (Includes items immediately corrected) Item No:

Conducted by,

Recommendation / Action Item / PM Notification

Acknowledge by,

Assigned To:

Completion Date:

Approved by,

(……………………)

(……………………….)

(…………………)

33 – Inspeksi Personnel Basket SUBJECT

: Personal Basket

INSPECTION NO :

LOCATION :

DATE

:

INSPECTOR :

SIGN

:

ITEM

DESCRIPTION

Y

1

Apakah master link (2 ea) dalam kondisi baik?

2

Apakah bolt type anchor safety shackle terpasang dengan moralistis dan dalam kondisi baik?

3

Apakah load line intern kondisi baik?

4

Apakah synthetic safety line terbambang dan dalam keadaan baik?

5

Apakah nylon safety strap intern kondisi baik?

6

Apakah galvanised cable dalam kondisi baik?

7

Apakah 4 buah bolt type anchor safety shackle (diatas frame) terpasang dengan etis dan dalam kondisi baik?

8

Apakah foam covered dalam kondisi baik?

9

Apakah stainless steel eyebolt dalam kondisi baik?

11

Apakah powder coated aluminium frame intern kondisi baik?

12

Apakah expanded aluminum metal top internal kondisi baik?

13

Apakah semua vertical grab lines dalam kondisi baik?

14 15

Apakah lanyard dan snap hook berfungsi & dalam kondisi baik? Apakah nylon netting dalam kondisi baik?

16

Apakah rubber floor mat dalam kondisi baik?

17

Apakah foam bumper covered n domestik kondisi baik?

18

Apakah shock absorbing rubber feet dalam kondisi baik? Apakah terdapat data Inspeksi dan sertifikat

19

Recommendations/Action Items (Includes items immediately corrected) Item Recommendation / Action Item / PM Notification No:

Assigned To:

Kaki langit

N/A

Completion Date:

Conducted by,

(……………….)

Acknowledge by,

Approved by,

(…………………)

(………………..)

Note: Lihat petunjuk pada susuk dihalaman berikut. Gambar Personal Basket

34 – Inspeksi Hooks SUBJECT : Hooks LOCATION : INSPECTOR : ITEM 1 2 3 4 5 6 7 8 9 10

INSPECTION NO : DATE : SIGN :

DESCRIPTION SWL atau WLL terbaca jelas N domestik keadaan masif & terawat Memiliki sahifah nan masih berlaku Keausan tidak makin 8% Tidak ada perubahan bentuk sebagai halnya; bengkok, meregang, retak Tidak korosi atau rusak akibat bahan kimia Safety catch berfungsi dengan baik Pembukaan interior hook lain bertambah 15% Peralatan bisa bergerak bebas Setiap episode bekerja dengan baik

Recommendations/Action Items (Includes items immediately corrected) Item Recommendation / Action Item / PM Notification No:

Y

Assigned To:

Lengkung langit

Tepi langit/A

Completion Date:

Conducted by,

Acknowledge by,

Approved by,

(……………….)

(…………………)

(………………..)

35 – Inspeksi Blocks Sheave SUBJECT

: Blocks Sheave

INSPECTION NO :

LOCATION :

DATE

:

INSPECTOR :

SIGN

:

ITEM

DESCRIPTION

Y

N

Lengkung langit/A

1

SWL atau WLL terbaca jelas

2

Dalam situasi ikhlas & terawat

3

Keausan tidak bertambah 8%

4

Tidak suka-suka perubahan tulangtulangan sama dengan; bengkok, meregang, retak

5

Tidak korosi atau rusak akibat objek kimia

6

End fitting, terminal attachment ataupun sambungan tidak rusak

7

Peralatan bisa bergerak adil

8

Setiap bagian bekerja dengan baik

9

Setiap pin dan asesoris sesuai tipe dan ukuran dan tidak rusak

Recommendations/Action Items (Includes items immediately corrected) Item No:

Recommendation / Action Item / PM Notification

Assigned To:

Completion Date:

Conducted by,

Acknowledge by,

Approved by,

(……………….)

(…………………)

(………………..)

36 – Inspeksi Shackles SUBJECT : Shackles LOCATION : INSPECTOR : ITEM 1 2 3 4 5 6 7 8 9

INSPECTION NO : DATE : SIGN : DESCRIPTION

SWL atau WLL terbaca jelas Pastikan sertifikat masih berlaku Dalam keadaan bersih Keausan lain lebih 8% Bukan ada peralihan gambar seperti; pekuk, meregang, retak Tidak korosi ataupun kemungkus akibat alamat ilmu pisah Setiap bagian berkreasi dengan baik Peralatan dapat bergerak bebas Pastikan dimensi pin, nut dan shackle sesuai

Y

N

Tepi langit/A

Recommendations/Action Items (Includes items immediately corrected) Item Recommendation / Action Item / PM Notification No:

Assigned To:

Completion Date:

Conducted by,

Acknowledge by,

Approved by,

(……………….)

(…………………)

(………………..)

37 – Inspeksi Chain Block SUBJECT : Chain Block LOCATION : INSPECTOR : ITEM 1 2 3 4 5 6 7 8 9 10 11 12 13

INSPECTION NO : DATE : SIGN : DESCRIPTION

Y

Horizon

N/A

SWL atau WLL terbaca jelas Punya sertifikat Dalam keadaan asli dan terawatt Keausan tidak lebih 8% Cover n domestik kondisi baik Tak korosi maupun busuk akibat alamat ilmu pisah Rantai dalam kondisi baik Peralatan bisa bergerak independen Setiap penggalan bekerja dengan baik Safety latch lega hook bekerja dengan baik Hook dalam kondisi baik Load chain guide dan load chain stopper berfungsi dengan baik Hook atas dan chain block tersambung dengan benar

Recommendations/Action Items (Includes items immediately corrected) Item Recommendation / Action Item / PM Notification No:

Assigned To:

Completion Date:

Conducted by,

Acknowledge by,

Approved by,

(……………….)

(…………………)

(………………..)

38 -Checklist Life Raft (Dilakukan weekly/monthly) SUBJECT

: Life Raft

INSPECTION NO :

LOCATION :

DATE

:

INSPECTOR :

SIGN

:

ITEM

DESCRIPTION

Y

1

Are the life rafts easy to reach/Apakah life raft mudah dijangkau?

2

Are the life rafts within their certification/Apakah life raft memiliki sertifikat yang andal?

3

Is the capacity of the life rafts adequate for all personnel onboard /Apakah kapasitas life raft sesuai dengan kuantitas POB?

4

Is the quick push button installed properly and easy to operate/Apakah “quick push botton terpasang dengan benar dan mudah dioperasikan?

5

Is the launching skid in good condition and easily operated/Apakah skid peluncur internal kondisi baik dan mudah dioperasikan?

6

Is the hydrostatic release in good condition/Apakah hydrostatic release dalam kondisi baik?

7

Are the personnel in charge of operating the life raft trained properly/Apakah penanggung jawab pengoperasian lift raft terbimbing?

8

Is planned inspection/maintenance conducted on those life rafts/Apakah tulangtulangan pemeriksaan/perawatan dilakukan pada life raft?

9

Launching intructions/Intruksi peluncuran life raft terbentang?

N

N/A

Recommendations/Action Items (Includes items immediately corrected) Item

Recommendation / Action Item / PM Notification

Assigned To:

Completion

No:

Date:

Conducted by,

Acknowledge by,

Approved by,

(……………….)

(…………………)

(………………..)

39 -Checklist Life Boat (Dilakukan weekly/monthly) SUBJECT : Life Boat LOCATION : INSPECTOR : ITEM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

INSPECTION NO : DATE : SIGN :

DESCRIPTION Akal masuk ke life boat bukan terhalang & licin RELEASING GEAR & HOOK Releasing Hook dalam kondisi baik Release Gear berfungsi dengan benar ATTACHMENT FOR THE BOAT Drain Valve berfungsi Rudder dan Tiller berfungsi dengan baik Hand-hold atau Buoyant Lifeline diluar rahim life boat Hand-hold dibawah lambung lifeboat Loker atau kompartemen kedap air Painter & perangkat pengaman painter Posisi tempat duduk & alat komunikasi Peralatan P3K, Makanan, Air menenggak, pancing, dayung dll Lampu yang dikendalikan manual Bohlam penyinaran dalam lifeboat LAUNCHING APPLIANCES Lifeboat dapat diturunkan atau dinaikan (dicoba beberapa meter) Kondisi dari Boat davit / peralatan peluncur berfungsi LIFEBOAT ENGINE Test jalankan engine lebih dari 1 menit Periksa steering system privat kondisi baik, sambungan benang tembaga, pelumas bagian bergerak kalau diperlukan (Pastikan sensor momen bagian berputar aman) Aki dalam kondisi terisi penuh Kondisi gear box dan gear box train baik OTHERS General Emergency Alarm System berfungsi Penyorotan di embarkasi cukup (Emergency Light) Sprinkler atau water spray system berfungsi

Recommendations/Action Items (Includes items immediately corrected) Item Recommendation / Action Item / PM Notification No:

Conducted by,

Acknowledge by,

Y

Assigned To:

N

N/A

Completion Date:

Approved by,

(……………….) (…………………) (………………..) 40 -Checklist Vessel Fire Prevention & Protection (Weekly/monthly) SUBJECT : VESSEL FIRE PREVENTION & PROTECTION LOCATION : INSPECTOR : ITEM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39

INSPECTION NO : DATE : SIGN :

DESCRIPTION Fire fighting, extinguishing and rescue equipment. Has the emergency fire pump been tested at this inspection? Have all fire hoses been visually inspected and tested in the last 30 days? Are all extinguishers required in place, in good condition, of the correct type and within their certification period? Are all spaces in which survey or other temporary equipment has been fitted adequately supplied with extinguishers of the correct type? If flammable materials are to be stored onboard, e.g. kerosene, Paint, is a foam extinguisher or flood system in place and in working bestelan? Has a fire drill been held within the last month? Has a Man overboard drill been carried out in the last month? Fire equipment locations marked and their access obstruction free. Proper maintenance of fire equipment. Has all equipment been clearly labeled Proper storage of flammable materials. Are all flammable materials stored in a dedicated area? Does this area have suitable fire extinguishers or a deluge system installed? Alarm systems. Do all enclosed spaces have these detectors? Are the detectors linked to a central sirene and display panel? Are occupants familiar with the alarm’s sound ? Where is the panel? Fire fighting drills and training. Are all the crew trained in Fire Fighting Techniques? How often does the crew carry out fire fighting drills? Emergency planning and response. Is there a pataka drill for fire fighting, including the composition or fire fighting parties? Are emergency drills conducted regularly? Are the fire fighters trained properly ? Co-ordinator for fire prevention and protection? Is there a dedicated person for fire prevention and protection? Fire fighting, extinguishing and rescue equipment. Has the emergency fire pump been tested at this inspection? Have all fire hoses been visually inspected and tested in the last 30 days? Are all extinguishers required in place, in good condition, of the correct type and within their certification period? Are all spaces in which survey or other temporary equipment has been fitted adequately supplied with extinguishers of the correct type? If flammable materials are to be stored onboard, e.g. kerosene, Paint, is a foam extinguisher or flood system in place and in working bestelan? Has a fire drill been held within the last month? Has a Man overboard drill been carried out in the last month? Fire equipment locations marked and their access obstruction free. Proper maintenance of fire equipment. Has all equipment been clearly labeled

Y

Falak

Falak/ A

40 41 42 43 44 45 46 47 48 48 50 51 52 53 54 55 56

Proper storage of flammable materials. Are all flammable materials stored in a dedicated area? Does this area have suitable fire extinguishers or a deluge system installed? Alarm systems. Do all enclosed spaces have these detectors? Are the detectors linked to a central alarm and display panel? Are occupants familiar with the sirene’s sound ? Where is the panel? Fire fighting drills and training. Are all the crew trained in Fire Fighting Techniques? How often does the crew carry out fire fighting drills? Emergency planning and response. Is there a bendera drill for fire fighting, including the composition or fire fighting parties? Are emergency drills conducted regularly? Are the fire fighters trained properly ? Co-ordinator for fire prevention and protection? Is there a dedicated person for fire prevention and protection?

Recommendations/Action Items (Includes items immediately corrected) Item Recommendation / Action Item / PM Notification No:

Assigned To:

Conducted by,

Acknowledge by,

Approved by,

(……………….)

(…………………)

(………………..)

Completion Date:

41 -Inspeksi Vessel Pedestal Grinder SUBJECT : VESSEL PEDESTAL GRINDER LOCATION : INSPECTOR : ITEM 1 2 3 4 5 6 7 8 9

INSPECTION NO : DATE : SIGN : DESCRIPTION

Is there a pedestal grinder? Is the wheel guard securely fastened? Is the glass shield fitted and clean? Is there a full-face shield or goggles available for use when grinding? Are safety notices posted with regards to wearing of eye protection? Is the work rest securely clamped and clearance within 1/8″ or 3.2 mm? Is the frame securely mounted, is there any vibration? Is the wheel face well lighted and dressed evenly? Is a guard for power belt or drive in place?

Y

N

N/A

10

Are planned inspections/maintenance carried out on this equipment?

Recommendations/Action Items (Includes items immediately corrected) Item Recommendation / Action Item / PM Notification No:

Assigned To:

Completion Date:

Conducted by,

Acknowledge by,

Approved by,

(……………….)

(…………………)

(………………..)

42 -Inspeksi Vessel Welding Machine & Transformer SUBJECT : VESSEL WELDING MACHINE & TRANSFORMER LOCATION : INSPECTOR : ITEM 1 2 3 4 5 6 7 8

INSPECTION NO : DATE : SIGN :

DESCRIPTION

Y

N

N/A

Is the welding transformer in good condition? Is the junction box sealed properly? Is the plug and receptacle installed properly? Are the welding cables in good condition? Are there any written operating procedures for this equipment? Is planned inspection and maintenance conducted? Is the welding machine in good condition? Are the personnel trained / certified and provided with proper PPE?

Recommendations/Action Items (Includes items immediately corrected) Item Recommendation / Action Item / PM Notification No:

Assigned To:

Completion Date:

Conducted by,

Acknowledge by,

Approved by,

(……………….)

(…………………)

(………………..)

43 -Inspeksi Vessel Anchor Winch SUBJECT : VESSEL ANCHOR WINCH LOCATION : INSPECTOR : ITEM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

INSPECTION NO : DATE : SIGN : DESCRIPTION

Y

N

N/A

Are the wires in good condition and greased properly? Is the line out and tension meter in good condition and calibrated? Are the wires certified by an outside agency? Are the engines (power pack) in good condition and ready for use? Are the winches provided with a brake? Are the rotating parts / couplings / flanges covered properly? Is the emergency released provided for the mooring system and does it work properly? Is there any written procedure to operate the winches? Are the winch operators properly trained? Is planned inspection on this equipment conducted? Mooring System (8 point, single/double lembah, maintenance records) Condition of anchor winches. (rusty/muddy/maintained/clean/oiled) Driven by air/hydraulic/electric or diesel (type) Condition of Hoses/any leaks. (dirty/oil pools on ground) If diesel pencetus driven – check for oil leaks Is chain in good condition? Type of splice and eye for anchors

Recommendations/Action Items (Includes items immediately corrected) Item Recommendation / Action Item / PM Notification No:

Assigned To:

Completion Date:

Conducted by,

Acknowledge by,

Approved by,

(……………….)

(…………………)

(………………..)

44 -Inspeksi Vessel Oxy/Acetylene Welding SUBJECT : VESSEL OXY / ACETYLENE WELDING LOCATION : INSPECTOR : ITEM 1 2 3 4 5 6 7

INSPECTION NO : DATE : SIGN :

DESCRIPTION

Y

N

Kaki langit/A

Are the cylinders kept in proper racks? Are the hoses provided with flame arresters? Are the hoses and the connections in good condition? Is the pressure gauge in good condition? Are the personnel trained properly and provided with proper PPE? Is there any written operating procedure for this equipment? Is planned inspection on this equipment conducted?

Recommendations/Action Items (Includes items immediately corrected) Item Recommendation / Action Item / PM Notification No:

Assigned To:

Completion Date:

Conducted by,

Acknowledge by,

Approved by,

(……………….)

(…………………)

(………………..)

45 -Inspeksi Vessel Pressurized Cylinders SUBJECT : VESSEL PRESSURIZED CYLINDERS LOCATION : INSPECTOR : ITEM 1 2 3 4 5 6 7

INSPECTION NO : DATE : SIGN :

DESCRIPTION

Y

N

N/A

Are the cylinders provided with shipping caps? Are the cylinders provided with a pressure gauge and regulator? Are they stored in dry and shaded are in a vertical position and with safety guard? Are the Oxygen and Acetylene cylinders stored separately? Are the full or empty cylinders marked? Is the flammable pressurized gas storage provided with fire extinguishers? Are the cylinders in test/ hydro tested?

Recommendations/Action Items (Includes items immediately corrected) Item Recommendation / Action Item / PM Notification No:

Assigned To:

Completion Date:

Conducted by,

Acknowledge by,

Approved by,

(……………….)

(…………………)

(………………..)

Source: https://idoc.pub/documents/form-inspeksi-6ng2e1g182lv